Technology

Works Under Technology

EXPLORATION OF ANTI-INFLAMMATORY POTENTIAL OF CITRUS MAXIMA (SHADDOCK) LEAF ON RAT.

ABSTRACTCitrus maxima (shaddock) is a medicinal plant used in Asia, and in some parts of Africa, because they are rich in flavonoids and some other phytoconstituent which contributed to their wide range of biological activities ranging from anti-inflammatory activity, antioxidant activity and anti tumor activity. Inflammation is the biochemical and cellular response that occurs in all vascularized tissues whose health is threatened either by internal or external source such as pathogens, dama...

Save
IKenna Gerald Premium 71 PAGES (6994 WORDS) Laboratory Technology Project 583 Views 0 Orders
ISOLATION AND IDENTIFICATION OF MICROBES ASSOCIATED WITH SPOILAGE CANNED FOOD SOLANUM LYCOPERSICUM

ABSTRACTLactic acid bacteria (LAB) associated with gaseous spoilage of modified – atmosphere – packaged, raw, tomato – marinated boiler meat striped were identified on the basis of a restriction fragment.Lactic acid bacteria are the dominant spoilage organisms in vacuum or modifies atmosphere – packaged meat products. Spoilage is mainly caused by lactobacillus. The activities of these organisms at stationary phase produce the compounds associated with sensory spoilage.The present stud...

Save
Olaade Deborah Premium 30 PAGES (3658 WORDS) Laboratory Technology Project 1797 Views 0 Orders
LABORATORY ANALYSIS AND PIPELINE PRODUCTS MARKETING COMPANY (PPMC) DEPOT OPERATIONS

ABSTRACTThis research work was carried out to evaluate the laboratory analysis of pipeline products marketing company (PPMC) depot operations. In the course of the research many scholarly articles on the subject matter were reviewed from which the researcher got lot information concerning the topic at hand. Thus making the research work a reliable source of information as far as facts about petroleum products marketing company (PPMC) is concerned.The Pipeline Inspectorate is charged with...

Save
Aka Possibility Premium 64 PAGES (8472 WORDS) Laboratory Technology Project 893 Views 0 Orders
Management of Materials on Building Construction Site

 .Abstract. The paper considers the management of materials on building construction sites. In thestudy, method of material procurement practice on construction site, factors affecting material management on building construction site as well as causes wastages on construction sites were determined. The study further Suggest measures for effective material management in construction site. Data for the study was obtained through a structured questionnaire administered to respondents ...

Save
Murtala Lamidi Premium 58 PAGES (12819 WORDS) Building Technology Project 376 Views 0 Orders
Network Analysis as an effective maintenance planning tool, using Warri Refinery as a case study

ABSTRACT This research project “Network Analysis as an effective maintenance planning tool” created a detailed evaluation of strategies and techniques for planning maintenance activities in the Nigerian process industry, laying focused emphasis on operations of Warri Refinery and the effectiveness of CPM Network analysis. A review of previous works related to maintenance planning was ext...

Save
Chima Kachi Premium 82 PAGES (13581 WORDS) Project Management Technology Project 523 Views 0 Orders
Problems facing the Nigerian port and possible solutions to solving the identified problems

§ § § § Types of port congestion § Causes of port congestion § Positive impacts of port congestion § Negative impacts of port congestion § Solutions to the port congestion problem § Intermodal transport development and port congestion § Other challe...

Save
Olayinka Leo 15 PAGES (3430 WORDS) Maritime And Management Technology Essay/Paper 0 Views 0 Orders
PRODUCTS CONTAMINATION AND QUALITY CONTROL ANALYSIS

SYNOPSISQuality control can be seen as the activities that sustain the quality of a product in order to satisfy a given requirement or meet certain standards. (McGraw-Hill Dictionary, 2003). It is applicable in all phases of the production cycle. In food products, qualities such as composition, structure (molecular, microscopic and macroscopic), physicochemical and sensory attributes are all analyzed.  These analyses are carried out both to satisfy customers’ and meet regulatory standa...

Save
Chukwuemeka Eze Premium 39 PAGES (7482 WORDS) Laboratory Technology Project 935 Views 0 Orders
Project Cost Control in the Nigerian Construction Industry

ABSTRACT The construction industry being solely responsible for economic growth of the nation will base on the government’s fiscal policy and budget the formulation of its own policy plan on how to carry out development within that budget and equally give the nation a healthy developed environment. Besides, the overall aim of cost control and management is to make sure that scarce resources are utilized to the optimum benefits of the main parties to a construction contract. That means ...

Save
Anderson Ugwu Premium 18 PAGES (5269 WORDS) Project Management Technology Essay/Paper 1254 Views 0 Orders
REHABILITATION OF ROAD LINKING UMUEKULUMMIRI STREET TO IMT AWARNESS GROUND JUNCTION IMT CAMPUS III ENUGU

ABSTRACTThis project entitled “Rehabilitation of Road” is aimed at investigating the causes of failure on the road linking Federal Secretariat, IMT Civil soil lab to Industrial Centre IMT Campus III Enugu and the possible way of re-designing it for its effective use by IMT community and visitors of IMT.  But before the road is being re-designed, effort was made to find out the causes of the road failure along this road which includes lack of drainage system, lack of maintenance, inad...

Save
Dude Lebowski Premium 108 PAGES (18866 WORDS) Construction Management / Construction Technology Project 745 Views 0 Orders
Relationship between Material Management Approach and Scheduled Project Completion Time

AbstractConstruction projects are known to experience time delays due to various reasons. The aim of this study is to find out if the material management approach used on building projects has a relationship with the scheduled completion time of the projects. Various literatures were reviewed so as to identify the different material management techniques available and classification of time overrun. The study was carried out on building projects situated in Lagos and simple random sampling te...

Save
Anderson Ugwu 13 PAGES (3849 WORDS) Construction Management / Construction Technology Essay/Paper 1575 Views 0 Orders

21 - 30 Of 42 Results